To
ensure complete
conservation,
harvesting and
recycling of non
renewable resources
like water, and
energy.
Installation of complete
bms system for all
services to ensure their
optimum utilization.
Use of
solar panels and to
generate alternate
energy as much as
possible.
Use of highly
efficient double insulated
glass to reduce the incident
of heat loads and other
harmful rays.
Insulating all
terraces and use of non
absorptive reflective
materials.
Access
and Circulation
To create
separate loops for specific
visitors accessing the building
and allocating proportionate
amount of parking space based on
the traffic analysis.
All three basements to
have maximum coverage to achieve one
car per 400 sqft of usable space.
Quick access and exit
for basements through 10 m wide
ramps at a slope of 1:12
Providing two way minimum
10m wide roads and separate car drop off
loops for all the buildings.
Other Facilities
4.2
m floor to floor height to get minimum
of 10' to 12' after false ceiling to
create esthetical spaces.
Future provisioning for all
power and services requirement.
Centralized DG sets to cater
to full loads and power back up.
Sensor controlled facade lighting
for engineering excellence.
Communications &
Networking
MUX
facility on a fiber-optic backbone.
Vertical shafts connecting at all
levels for dish & radio antennas.
Entire complex on BMS system for
Service & Efficient energy consumption.
Sound system compiled with the PA system.
HVAC System
Water based chiller system.
Sensor controls AHU's wired to BMS room for
temp. & humidity control.
Treated fresh air with ozonizers,
carbon monoxide filters.
Parking areas to be ventilated & carbon
monoxide filters to be installed.
Facade
Facade to be an Engineering marvel &
finished to world class standards.
Iconic blending of art & technology that would
stand testimony of time.
Metal canopy on the terrace spanning the
towers on all side will create a spectacular display of
authority and distinction.
Ensuring Timelines... To ensure quality and timely deliveries of the project,
Anant Raj Group is rapidly expanding its inhouse construction
wing and project dedicated management team. A round the clock
monitoring of the project and strict adherence to the pert
charts is producing state of the art onsite results.